Sunday, April 5, 2009

ROUGH IN!


We've had 2 successful in-progress inspections with our city and our HUD consultant. (I'll get to the HUD consultant situation on another posting.) With 2 successful inspections, we're feeling encouraged by the progress. We've been going down into the deconstructive valley of the project so far, and now we're starting the climb out of the hole, toward the constructive, built-it-back-up side.

In 4 weeks since our project started, our contractor (Jose) has fixed our foundation, roughed-in the plumbing, the electrical, demolished the baths, the kitchen, the ceilings, reroofed, and fixed all of the broken windows. It still looks rough. The best part of it is all the ugly, unsafe stuff that's GONE!
Although I would never purport to be a building expert, I learned a lot growing up in my family's hardware business. I like knowing about how things are built, but I've learned I like even more pointing out when things are wrong. Nowhere in the new house has this been more apparant than in our 2 bathrooms.
The front bathroom had 1" thick travertine floor to ceiling, in a gothic cross in the shower. Despite the zealous application of Italian marble, the installation wasn't properly sealed or supported, causing the subfloor to soften underneath, the tile to crack. The only place where the marble tile was absent was behind the toilet, where a rectangle of tile was removed to install the tank, so that the door swing would still open. One quarter of the floor space of the front bath was taken up by a hot-water heater that would keep a family of 12 happy - which was of course, not vented at all, filling the adjacent bedrooms with carbon monoxide gas.





By the way, the creature hiding in the shower drain, to my delight, is a 4 inch plastic rhinoceros. He hangs out now on my desk. He has a mate that we found in the mailbox shortly before we closed escrow. If only they could tell us what the previous owners were thinking...
In any case, we're glad that the front bath has been stripped of it's former "character". It's down to replaced subfloor and studs and new copper plumbing, and it's ready for new drywall, tile, fixtures & paint.

It has been even more exciting to see the back bathroom get deconstructed. Perhaps to make it more inviting, it used to feature an arched doorway made of crackled plaster-of-paris and painted pea-green chartreuse. Textured wall paper and finger-painted faux brick were intended to bring to mind turn-of the century nostalgia. The shower was sealed with crown moulding. Note, this is the only crown moulding in the house, but it was put to good use. It's hard to picture, so I hope the photo helps.




In addition to getting rid of the black throne, the crown moulding and the painted windows, Jose has installed copper plumbing throughout, replacing many bad galvanized-to-copper unions (some things shouldn't mix). They've replaced the foundation under the back bath, and rebuilt the wall where the studs were cut through to install a line for a washer & dryer. Now, we won't have to go through that archway to sit on the black throne, AND the back of the house won't fall off.


I feel like our house has just gone through chemotherapy. We've gotten rid of al of the bad, and we're ready to be healthy again!
Next Stop: Kitchen!

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.